Monday, October 5, 2009

Photos - October 2009

The following photos were taken during a visit on October 3rd, 2009. The truth is I visit the site regularly since May 2008 to monitor its progress. I guess like many other buyers, I feel very anxious, nervous, and also angry due to PKNS' tardiness.

Greeting you at Pangsapuri Belaian Bayu are these water mains (domestic and fire) located smack dab next to the entrance. At first I find it extremely obtrusive due to its sheer size but I think I will be able to ignore it in time.

A valve near the entrance, just next to the flag poles.

This was found in the "Bilik Sesalur MATV" - a cable (probably coaxial) hanging loose, apparently not connected to anything.

Next to the trash bin is a concrete slab with fasteners and some exposed wiring. Either a light pole or a public telephone should be sitting on it.

My guess is that these wirings are for smoke or heat detectors.

Align Left
Fire alarm and manual call point as seen on the ground floor. The fire extinguisher is missing.

Fire alarm panel. I don't know what the two illuminated LED means. At the very least, it suggests that there is power supply.

Align Left
Inside the "Bilik Meter TNB" where your meters will be fixed.

Inside the apartment units, the distribution boards (DB) are also yet to be installed. Once you have a TNB account, they'll fix the DB for you I guess.


Living room switch socket outlet (SSO) are not yet installed in most (or maybe all) of the units.

Kitchen SSO, also not yet installed.

The following are the procedures for obtaining CF as per MBSA requirements.

Syarat Permohonan :

Permohonan yang telah lengkap diisi hendaklah dikembalikan beserta dengan dokumen-dokumen berikut:-

a. Borang Semakan CF

b. Borang E

c. Surat sokongan jabatan yang berkaitan seperti:-

i. Jabatan Kejuruteraan

ii. Jabatan Perancangan

iii. Jabatan Lanskap

iv. Jabatan Bomba

v. Jabatan JKR

vi. Jabatab JPP

vii.Jabatan JPS

d. Gambar lanskap dan kemudahan-kemudahan awam seperti tempat letak kereta, hentian bas, tempat pembuangan sampah dan lain-lain (jika ada)

e. Gambar Infra termasuk jalan keluar masuk, longkang, parit erong dan lain-lain

f. Gambar luar dan dalam bangunan yang akan diberikan CF dan kawasan persekitaran bangunan.

Maybe things are basically in place for a CF application. However, I think there are considerable work that needs to be done before buyers can move in. Small fixes like the SSO, commissioning of the elevator, cleaning, and some final touch-up could easily take weeks to complete.

No comments:

Post a Comment